SpaceMiningData
CompanyJapanActive

ispace, inc.

Tokyo-based lunar lander company listed on the Tokyo Stock Exchange Growth Market (code 9348) whose two landing attempts (April 2023 and June 2025) both ended with the lander lost before a soft touchdown. It held a December 2020 NASA contract to collect lunar regolith and transfer ownership in place; because neither lander landed, no regolith was collected or transferred.

Targeted

Resources and evidence

Each resource shows the highest step primary sources support. How the ladder works.

ResourceEvidenceMeaning
RegolithTargetedmission aimed at it
Water iceClaimedsays it will

Demonstrated

Launched two landers (2022-12-11 and 2025-01-15) that reached lunar orbit; both were lost during landing, so no lunar regolith was collected and no ownership transfer to NASA took place. Mission 2 carried a Takasago Thermal Engineering water-electrolysis payload filled with ultra-pure water supplied from Earth by Kurita; it could not operate on the surface because the lander was lost.

Claimed or planned

ispace states it will build a lunar economy around lunar water resources; it has signed a feasibility MoU with Takasago on thermal mining for lunar water extraction (May 2025), a lunar water-resource partnership with Kurita (Dec 2025), and a sample-return MoU with ElevationSpace (Sept 2025), and its Mission 4 (planned 2029) is to carry ESA's MAGPIE water-ice prospecting rover.

Facts

Headquarters
Japan
Type
Company
Founded
2010
Status
Activeas of 2026-09-09. Company releases dated 2026-08-07 (Q1 results, TSE-listed) and 2026-09-09 (new bank loan) describe continuing development of ULTRA-lander Missions 3 (2028) and 4 (2029).
Roles
Lander / transport, Rover / mobility
Targets
Moon
Subsidiaries
ispace EUROPE S.A., ispace technologies U.S., inc.
Also known as
ispace; ispace Japan; White Label Space Japan (predecessor name)
Website
ispace-inc.com

Missions

5 records
MissionRoleLaunchPhaseOutcome
HAKUTO-R Mission 1 (ispace M1 lander)SpacecraftOperator2022-12-11EndedFailure
SMBC x HAKUTO-R Venture Moon (ispace Mission 2, RESILIENCE lander)SpacecraftOperator2025-01-15EndedFailure
TENACIOUS micro-rover (ispace-EUROPE)PayloadCarrier2025-01-15EndedFailure
ispace Mission 4 (ULTRA lander; formerly Mission 6)SpacecraftOperatorPlanned 2029 (target)
Date details

Announcement date not recorded. Record checked 2026-09-25.

In developmentNot applicable
MAGPIE (Mission for Advanced Geophysics and Polar Ice Exploration) roverPayloadCarrierPlanned 2029 (target)
Date details

Announcement date not recorded. Record checked 2026-09-25.

In developmentNot applicable

Government authorizations held

CountryHolder and missionInstrumentGrantedLinked mission
JapanJapan Space Resources Act permit to ispace for HAKUTO-R Mission 1 (2022)Holder: ispace, inc.Space resources authorization2022-11-04GrantedHAKUTO-R Mission 1 (ispace M1 lander)Flew. Outcome: failure
JapanJapan Space Resources Act permit to ispace for Mission 2 (RESILIENCE) (2024)Holder: ispace, inc.Space resources authorization2024-12-17GrantedSMBC x HAKUTO-R Venture Moon (ispace Mission 2, RESILIENCE lander)Flew. Outcome: failure

Dated events

Amounts are shown one at a time as each source states them. They are never added together.

  1. 2026-09-09

    ispace bank loan from Shizuoka Bank (3 billion yen)

    Otherispace, inc.JPY 3,000,000,000 (company announcement)

    ispace announced a board resolution for a 3 billion yen (about USD 19 million) three-year unsecured loan from Shizuoka Bank for working capital, with borrowing scheduled for September 2026.

    Company announcement. No counterparty or government record found.

    Sources (1) and evidence gaps
    1. ispace, inc.Company statementPublished 2026-09-09Accessed 2026-09-25Supports: amount, date
      a resolution has been made by its Board of Directors to secure approximately $19 Million USD (¥3 Billion JPY) in new financing as part of a loan agreement with Shizuoka Bank.
      Quote matched the source text when accessed.
    • Drawdown confirmation not found (borrowing date stated as tentative).
  2. 2026-08-07

    Japan Space Strategy Fund grant to ispace for polar high-precision landing (Mission 4)

    ispace announced an 11.6 billion yen grant (ceiling 20 billion yen, subject to stage-gate reviews) under Phase 2 of Japan's Space Strategy Fund, administered by JAXA, for high-precision landing near the lunar south pole on Mission 4; the project was selected on 2026-01-16.

    Company announcement. No counterparty or government record found.

    Sources (1) and evidence gaps
    1. ispace, inc.Company statementPublished 2026-08-07Accessed 2026-09-25Supports: amount
      Grant Amount: 11.6 billion yen The maximum grant amount remains 20 billion yen.
      Quote matched the source text when accessed.
    • JAXA-side award record not retrieved.
    • The January 2026 selection release called the project Mission 6; the August 2026 award release renumbered it as Mission 4.
  3. 2026-07-09

    NASA CLPS CP-12 task order ended; ispace-U.S. subcontract to terminate

    ispace disclosed that NASA and Draper mutually ended CLPS task order CP-12 effective 2026-07-09 (U.S. Mountain Time); ispace-U.S.'s subcontract with Draper to provide the lander is expected to be terminated.

    Sources (3) and evidence gaps
    1. ispace, inc.Court or regulatory filingPublished 2026-07-15Accessed 2026-09-25Supports: date, summary
      On July 9, 2026 (U.S. Mountain Time), the mutual end of the contract related to CLPS* Task Order CP-12 entered into between the National Aeronautics and Space Administration ("NASA") and The Charles Stark Draper Laboratory, Inc. ("Draper") was effectuated.
      Quote matched the source text when accessed.
    2. ispace technologies U.S., inc.Company statementPublished 2026-07-15Accessed 2026-09-25Supports: summary
      Draper has mutually agreed with NASA to end the Commercial Lunar Payload Services (CLPS) task order CP-12.
      Quote matched the source text when accessed.
    3. ispace, inc.Company statementPublished 2026-08-07Accessed 2026-09-25Supports: summary
      While the termination of CP-12 is a negative, we view the major business opportunities we are now focusing on as extremely positive.
      Quote matched the source text when accessed.
    • Draper is not recorded as an organization here, so no counterparty is linked. The final subcontract termination notice was not found.
  4. 2026-05-13

    ispace - University of Leicester payload service agreement for a lunar Raman spectrometer

    Contractispace, inc.

    ispace announced a payload service agreement to carry a University of Leicester Raman spectrometer, intended to determine lunar surface molecular composition and identify resources, on a future ULTRA lander mission not yet assigned.

    Company announcement. No counterparty or government record found.

    Sources (2) and evidence gaps
    1. ispace, inc.Company statementPublished 2026-05-13Accessed 2026-09-25Supports: summary, resources
      The instrument will analyse the lunar surface to determine its molecular composition and identify resources that could support future human exploration missions.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2026-05-13Accessed 2026-09-25Supports: summary
      The specific mission assignment has not yet been determined.
      Quote matched the source text when accessed.
    • University of Leicester is not recorded as an organization here, so no counterparty is linked.
  5. 2026-03-27

    ispace ULTRA lander integration and mission renumbering

    ispace announced it would merge the APEX 1.0 and Series 3 designs into the ULTRA lander with a new engine, renumbering its missions: Mission 3 (formerly 4) planned for 2028, Mission 4 (formerly 6) for 2029, and the ispace-U.S. CP-12 mission becoming Mission 5 with a proposed 2030 launch pending NASA approval.

    Company announcement. No counterparty or government record found.

    Sources (3)
    1. ispace, inc.Company statementPublished 2026-03-27Accessed 2026-09-25Supports: summary
      The ULTRA lunar lander, which will include a new engine-a change from the previous vendor-will be used in each of ispace's next missions, resulting in a mission shift and schedule update for ispace-U.S.'s first mission, now expected in 2030.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2026-03-30Accessed 2026-09-25Supports: summary
      Mission 4: Lunar Lander launch, 2029 (formerly Mission 6)
      Quote matched the source text when accessed.
    3. ispace, inc.Company statementPublished 2026-03-30Accessed 2026-09-25Supports: summary
      Mission 3: Lunar Lander launch, 2028 (formerly Mission 4) This mission is currently under development by ispace Japan funded through a Small Business Innovation Research (SBIR) grant
      Quote matched the source text when accessed.
  6. 2025-12-05

    ispace announces planned conclusion of the HAKUTO-R program

    On 2025-12-05, ispace announced that its HAKUTO-R program, begun in September 2018 and covering Missions 1 and 2, was expected to conclude on 2025-12-07 upon expiration of contracts with all 22 partner companies.

    Company announcement. No counterparty or government record found.

    Sources (1)
    1. ispace, inc.Company statementPublished 2025-12-05Accessed 2026-09-25Supports: date, summary
      the HAKUTO-R lunar exploration program launched in September 2018, will conclude upon the expiration of contracts with all 22 partner companies on Sunday, Dec. 7, 2025.
      Quote matched the source text when accessed.
  7. 2025-12-04

    ispace - Kurita Water Industries strategic partnership on lunar water resources

    Agreementispace, inc.

    ispace announced a strategic partnership agreement with Kurita Water Industries on business models, payload development and demonstration planning for lunar water resources, following a March 2025 MoU to carry a Kurita water-processing test device on an ispace mission after 2027.

    Company announcement. No counterparty or government record found.

    Sources (2) and evidence gaps
    1. ispace, inc.Company statementPublished 2025-12-04Accessed 2026-09-25Supports: date, resources
      have signed a strategic partnership agreement to create business opportunities focused on water resources and building supply infrastructure on the lunar surface in the future.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2025-03-10Accessed 2026-09-25Supports: summary
      This agreement memorializes cooperation to transport a water processing system to the lunar surface to conduct demonstration tests on an ispace lunar mission after 2027.
      Quote matched the source text when accessed.
    • Kurita Water Industries is not recorded as an organization here, so no counterparty is linked.
  8. 2025-10-06

    ispace public offering and third-party allotments (18.2 billion yen)

    Funding roundispace, inc.JPY 18,200,000,000 (company announcement)

    ispace resolved on 2025-10-06 to issue new shares through a public offering and third-party allotments, including about 2 billion yen from Kurita Water Industries and about 3 billion yen from Takasago Thermal Engineering; ispace later reported the October-November 2025 capital increase as 18.2 billion yen.

    Company announcement. No counterparty or government record found.

    Sources (3) and evidence gaps
    1. ispace, inc.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: investor names, amount
      The investment amount from Kurita Water Industries will be approximately ¥2 billion.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: investor names, amount
      The investment amount from Takasago Thermal Engineering will be approximately ¥3 billion.
      Quote matched the source text when accessed.
    3. ispace, inc.Company statementPublished 2026-05-15Accessed 2026-09-25Supports: amount
      Net Assets: 15,173 million yen Increased compared to the end of the previous fiscal year due to a capital increase (18.2 billion yen) carried out in October-November 2025.
      Quote matched the source text when accessed.
    • TSE timely disclosure 'Notice Regarding the Issuance of New Shares through a Public Offering and Third-Party Allotment' not retrieved; public-offering tranche amount not separated.
  9. 2025-10-06

    ispace-EUROPE - Magna Petra payload service agreement for NASA MSOLO (USD 22 million)

    ispace-EUROPE announced a USD 22 million payload service agreement with Magna Petra to integrate NASA's MSOLO mass spectrometer on an ispace-EUROPE micro-rover for Magna Petra's HALO helium-3 reconnaissance mission; the release placed the rover on ispace-U.S.'s APEX 1.0 lander (then 'Mission 3').

    Company announcement. No counterparty or government record found.

    Sources (5) and evidence gaps
    1. ispace EUROPE S.A.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: amount, date
      ispace-EUROPE and Magna Petra Corp. sign total amount of $22 million USD Payload Service Agreement (PSA) to carry NASA's MSOLO instrument to the lunar surface on the Mission 3 rover.
      Quote matched the source text when accessed.
    2. ispace EUROPE S.A.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: resources
      ispace-EUROPE will integrate a NASA-developed Mass Spectrometer Observing Lunar Operations (MSOLO) instrument into its upcoming Mission 3 lunar micro-rover platform as part of Magna Petra's Helium Availability of Lunar Origin (HALO) reconnaissance mission.
      Quote matched the source text when accessed.
    3. ispace EUROPE S.A.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: related ids
      The Mission 3 rover will fly on ispace technologies U.S.' (ispace-U.S.) APEX 1.0. lunar lander
      Quote matched the source text when accessed.
    4. ispace, inc.Company statementPublished 2025-11-17Accessed 2026-09-25Supports: summary
      This brings the total contract value for Mission 3 to $86 million USD, up from $64 million USD.
      Quote matched the source text when accessed.
    5. Magna Petra Corp.Company statementPublished 2025-10Accessed 2026-09-25Supports: amount
      today announced the execution of a $22 million Payload Service Agreement (PSA) with ispace-EUROPE S.A.
      Quote matched the source text when accessed.
    • Which ispace mission now carries the MSOLO rover after the March 2026 renumbering and the July 2026 CP-12 termination is not stated.
    • TSE timely-disclosure PDF not retrieved; payment terms and the effect of the March 2026 mission re-plan on this contract not disclosed.
  10. 2025-09-25

    ispace - ElevationSpace MoU on a private lunar sample return mission

    Agreementispace, inc.

    ispace announced an MoU with ElevationSpace to pursue a private mission returning a lunar sample to Earth, combining a planned ispace orbital transfer vehicle with ElevationSpace's re-entry capsule; no mission date was given.

    Company announcement. No counterparty or government record found.

    Sources (1) and evidence gaps
    1. ispace, inc.Company statementPublished 2025-09-25Accessed 2026-09-25Supports: date, resources
      have signed a memorandum of understanding to pursue a private mission that will return a lunar sample to Earth.
      Quote matched the source text when accessed.
    • ElevationSpace is not recorded as an organization here, so no counterparty is linked.
  11. 2025-05-09

    ispace - Takasago Thermal Engineering MoU on lunar thermal mining feasibility

    Agreementispace, inc.

    ispace announced an MoU with Takasago Thermal Engineering for a feasibility study toward demonstrating Takasago's thermal-mining water-extraction technology, still in research and development, on a future ispace rover.

    Company announcement. No counterparty or government record found.

    Sources (1) and evidence gaps
    1. ispace, inc.Company statementPublished 2025-05-09Accessed 2026-09-25Supports: date, resources
      The agreement aims to conduct a feasibility study for joint technology development with the goal of demonstrating the extraction of water on the Moon.
      Quote matched the source text when accessed.
    • Takasago Thermal Engineering is not recorded as an organization here, so no counterparty is linked.
  12. 2025-03-19

    Japan's OST Article XI notification for ispace Mission 2

    Japan informed the UN Secretary-General under OST Art. XI of ispace Lander Mission 2 (Mare Frigoris, 60.5 N 4.6 W), listing a commercial transaction with NASA for lunar regolith acquisition as a special consideration.

    Sources (2)
    1. United Nations, COPUOSGovernment recordPublished 2025-03-21Accessed 2026-09-25Supports: datepage 1
      Note verbale dated 19 March 2025 from the Permanent Mission of Japan to the United Nations (Vienna) addressed to the Secretary- General
      Quote matched the source text when accessed.
    2. United Nations, COPUOSGovernment recordPublished 2025-03-21Accessed 2026-09-25Supports: summarypage 2
      Special consideration: commercial transaction with the National Aeronautics and Space Administration of the United States of America for lunar regolith acquisition
      Quote matched the source text when accessed.
  13. 2024-12-10

    ispace - Magna Petra MoU on lunar resource exploration

    ispace announced a memorandum of understanding with Magna Petra to collaborate on future missions transporting Magna Petra's helium-3 prospecting and collection equipment to the lunar surface.

    Company announcement. No counterparty or government record found.

    Sources (2)
    1. ispace, inc.Company statementPublished 2024-12-10Accessed 2026-09-26Supports: summary, subject ids
      have agreed to collaborate on future missions to the lunar surface, the two companies announced.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2024-12-10Accessed 2026-09-26Supports: summary, subject ids
      Under terms of the memorandum of understanding, the two companies have agreed to collaborate on the development of a lunar economy that provides terrestrial economic value via non-destructive, sustainable harvesting of lunar surface resources.
      Quote matched the source text when accessed.
  14. 2024-10-09

    ispace and Asteroid Mining Corporation memorandum for lunar robot demonstration

    ispace and Asteroid Mining Corporation announced a memorandum of understanding envisioning a future ispace lunar lander delivering AMC's SCAR-E robot to the lunar surface as a technology demonstration; no mission or date was fixed.

    Sources (2)
    1. PayloadPressPublished 2024-10-10Accessed 2026-09-25Supports: summary
      Japanese lunar firm ispace has partnered with Asteroid Mining Corporation (AMC), a UK-based space robotics company, to deliver a space robot to the lunar surface
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2024-10-09Accessed 2026-09-26Supports: summary
      The memorandum of understanding signed by both companies provides a framework for collaboration
      Quote matched the source text when accessed.
  15. 2023-12-15

    Japan METI SBIR grant funding notice to ispace (12 billion yen)

    Grantispace, inc.JPY 12,000,000,000 (company announcement)

    ispace announced on 2023-12-21 that it received a notice of funding of 12 billion yen (about USD 80 million) on 2023-12-15 under METI’s Small Business Innovation Research program for developing and operating a lunar lander.

    Company announcement. No counterparty or government record found.

    Sources (2) and evidence gaps
    1. ispace, inc.Company statementPublished 2023-12-21Accessed 2026-09-25Supports: amount, date
      received a notice of funding of $80 million (12 billion Yen) on Dec. 15, 2023, for the Japanese government's Small Business Innovation Research (SBIR) grant.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2026-03-30Accessed 2026-09-25Supports: summary
      Mission 3: Lunar Lander launch, 2028 (formerly Mission 4) This mission is currently under development by ispace Japan funded through a Small Business Innovation Research (SBIR) grant
      Quote matched the source text when accessed.
    • METI's own award record was not retrieved. METI is not recorded as an organization here, so no counterparty is linked.
  16. 2023-04-12

    ispace listing on the Tokyo Stock Exchange Growth Market

    ispace announced on 2023-04-12 that its shares had been listed on the Tokyo Stock Exchange Growth Market that day.

    Company announcement. No counterparty or government record found.

    Sources (2) and evidence gaps
    1. ispace, inc.Company statementPublished 2023-03-08Accessed 2026-09-25Supports: date
      The date of listing on the Tokyo Stock Exchange Growth Market is scheduled to be April 12, 2023 (Wednesday)
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2023-04-12Accessed 2026-09-25Supports: date
      ispace has been listed on the Tokyo Stock Exchange Growth Market today, April 12, 2023.
      Quote matched the source text when accessed.
    • IPO proceeds not recorded; TSE prospectus / securities registration statement not retrieved.
  17. 2021-08-04

    ispace Series C round (approx. USD 46 million)

    Funding roundispace, inc.USD 46,000,000 (company announcement)

    ispace announced contracted Series C funding of JPY 5.07 billion (approximately USD 46 million for reference) from seven investors led by Incubate Fund. The release states that part was scheduled to be credited from August 2021 onward.

    Company announcement. No counterparty or government record found.

    Sources (1) and evidence gaps
    1. ispace, inc.Company statementPublished 2021-08-04Accessed 2026-09-25Supports: amount, round label, investor names
      announced that it contracted to fund approximately $46 million (USD)[i] from seven investors, including Incubate Fund as the lead investor, for its Series C investment round.
      Quote matched the source text when accessed.
    • Full Series C investor list not transcribed.
  18. 2020-12-03

    NASA lunar regolith purchase contract to ispace (Japan), $5,000

    NASA selected ispace (Japan) to collect a small amount of lunar regolith and transfer ownership in place to NASA for $5,000 (10% on award, 10% on launch, 80% on completion). The collection attempt under this contract was covered by Japanese permits for Mission 1 (lander lost 26 April 2023) and Mission 2 (lander lost 6 June 2025); no transfer has occurred as far as primary sources show.

    Sources (7) and evidence gaps
    1. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: subject ids, date
      NASA has selected four companies to collect space resources and transfer ownership to the agency: Lunar Outpost of Golden, Colorado; Masten Space Systems of Mojave, California; ispace Europe of Luxembourg; and ispace Japan of Tokyo.
      Quote matched the source text when accessed.
    2. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: amount
      ispace Japan proposed collection for $5,000 following arrival in 2022 of a lander to Lacus Somniorum on the Moon's northeastern near side.
      Quote matched the source text when accessed.
    3. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: summary
      Companies will receive 10% of their total proposed price upon award, will receive 10% upon launch, and the remaining 80% upon successful completion.
      Quote matched the source text when accessed.
    4. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: summary
      Subsequent to receiving such imagery and data, an "in-place" transfer of ownership of the lunar regolith to NASA will take place.
      Quote matched the source text when accessed.
    5. ispace, inc.Company statementPublished 2024-12-17Accessed 2026-09-25Supports: summary
      The license allows ispace to complete a contract awarded by NASA in December 2020, to acquire regolith from the lunar surface and transfer ownership to the space agency.
      Quote matched the source text when accessed.
    6. ispace, inc.Company statementPublished 2023-05-26Accessed 2026-09-25Supports: summary
      Although the lander did not complete a soft landing
      Quote matched the source text when accessed.
    7. ispace, inc.Company statementPublished 2025-06-06Accessed 2026-09-25Supports: summary
      it is currently assumed that the lander likely performed a hard landing on the lunar surface
      Quote matched the source text when accessed.
    • Current status of the contract after the Mission 2 loss (open, modified, or terminated) is not stated in any retrieved NASA or ispace source.
  19. 2020-08-20

    ispace Series B round (approx. USD 28 million)

    Funding roundispace, inc.USD 28,000,000 (company announcement)

    ispace announced a Series B round of approximately USD 28 million led by Incubate Fund's IF SPV 1st Investment Partnership, bringing its stated cumulative investment to about USD 125 million.

    Company announcement. No counterparty or government record found.

    Sources (2)
    1. ispace, inc.Company statementPublished 2020-08-20Accessed 2026-09-25Supports: amount, round label
      announced that ispace raised approximately $28 million (USD)[1] from the four organizations for its Series B investment round.
      Quote matched the source text when accessed.
    2. ispace, inc.Company statementPublished 2020-08-20Accessed 2026-09-25Supports: investor names
      IF SPV 1st Investment Partnership (managed by Incubate Fund) as the lead investor, Space Frontier Fund (managed by Sparks Innovation for Future, Inc.), Takasago Thermal Engineering Co., Ltd., and Mitsui Sumitomo Insurance Co., Ltd.
      Quote matched the source text when accessed.

Open evidence gaps

  • No NASA or ispace record found stating the final disposition (fulfilled, terminated or expired) of ispace's December 2020 regolith contract after the Mission 1 loss.
  • IPO proceeds not recorded: the TSE securities registration statement / prospectus was not retrieved.

Sources

12 sources
  1. ispace, inc.Company statementAccessed 2026-09-25Supports: founded year, aliases
    White Label Space Japan, the predecessor to ispace, is founded by Takeshi Hakamada to participate in the Google Lunar XPRIZE.
    Quote matched the source text when accessed.
  2. ispace, inc.Company statementPublished 2023-04-12Accessed 2026-09-25Supports: status, entity type
    ispace has been listed on the Tokyo Stock Exchange Growth Market today, April 12, 2023.
    Quote matched the source text when accessed.
  3. ispace, inc.Company statementPublished 2026-08-07Accessed 2026-09-25Supports: status, status as of
    ispace is actively pursuing new contracts for Mission 5 in 2029, in addition to steady development of Mission 2.5, scheduled to deploy a lunar satellite, and lunar landing missions in Mission 3 and Mission 4, scheduled for 2028 and 2029, respectively.
    Quote matched the source text when accessed.
  4. ispace, inc.Company statementPublished 2026-09-09Accessed 2026-09-25Supports: status, status as of
    a resolution has been made by its Board of Directors to secure approximately $19 Million USD (¥3 Billion JPY) in new financing as part of a loan agreement with Shizuoka Bank.
    Quote matched the source text when accessed.
  5. ispace, inc.Company statementPublished 2020-12-04Accessed 2026-09-25Supports: resources, resource activity
    The first contract, awarded to ispace, inc. (the company's headquarters in Tokyo, Japan), will collect regolith with its lander during its first mission (M1) planned in 2022
    Quote matched the source text when accessed.
  6. ispace, inc.Company statementPublished 2023-05-26Accessed 2026-09-25Supports: resource activity
    After reaching the scheduled landing time, the lander continued to descend at a low speed until the propulsion system ran out of fuel. At that time, the controlled descent of the lander ceased, and it is believed to have free-fallen to the Moon's surface.
    Quote matched the source text when accessed.
  7. ispace, inc.Company statementPublished 2025-06-06Accessed 2026-09-25Supports: resource activity
    As of 8:00 a.m. on June 6, 2025, mission controllers have determined that it is unlikely that communication with the lander will be restored and therefore completing Success 9, is not achievable. It has been decided to conclude the mission.
    Quote matched the source text when accessed.
  8. ispace, inc.Company statementPublished 2025-05-09Accessed 2026-09-25Supports: resource activity
    On ispace's Mission 2, "SMBC x HAKUTO-R VENTURE MOON" Takasago developed the main payload, water electrolysis equipment, to attempt to split water into molecules on the Moon.
    Quote matched the source text when accessed.
  9. ispace, inc.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: resource activity
    Kurita Water Industries provided ultra-pure water used in the water electrolysis device developed by Takasago Thermal Engineering Co., Ltd. that flew as a payload on ispace's Mission 2.
    Quote matched the source text when accessed.
  10. ispace, inc.Company statementAccessed 2026-09-25Supports: resources, resource activity
    At ispace, we've turned our attention to the Moon. By taking advantage of lunar water resources, we can develop the space infrastructure needed to enrich our daily lives on earth
    Quote matched the source text when accessed.
  11. ispace, inc.Company statementPublished 2025-05-09Accessed 2026-09-25Supports: resource activity
    The agreement aims to conduct a feasibility study for joint technology development with the goal of demonstrating the extraction of water on the Moon.
    Quote matched the source text when accessed.
  12. ispace, inc.Company statementPublished 2025-12-04Accessed 2026-09-25Supports: resource activity
    have signed a strategic partnership agreement to create business opportunities focused on water resources and building supply infrastructure on the lunar surface in the future.
    Quote matched the source text when accessed.