ispace's second lunar lander, RESILIENCE, launched 2025-01-15 on a Falcon 9 and attempted to land in Mare Frigoris; NASA reports a hard landing on 2025-06-05 UTC (2025-06-06 JST), which ispace attributes to a laser rangefinder hardware anomaly. It carried ispace-EUROPE's Tenacious rover (regolith scoop for a NASA ownership transfer) and a Takasago water-electrolysis payload using Earth-supplied water; neither operated on the surface.

Objective. Collect regolith on a lander footpad (to be photographed by the Tenacious rover) and a separate scoop sample via Tenacious, each for in-place ownership transfer to NASA under the two December 2020 contracts.

Targeted

Facts

Kind
Spacecraft
Mission type
Resource purchase demonstration
Target
MoonMare Frigoris, primary site near 60.5 N 4.6 W
Launch
2025-01-15
Launch vehicle
SpaceX Falcon 9
Phase
Endedispace status update of 2025-06-06 and technical cause analysis of 2025-06-24; NASA LRO imaged the impact site on 2025-06-11.
Outcome
FailureBasis: operator statement
Why it is included
Resource transaction

Outcome statement (operator statement)

As of 8:00 a.m. on June 6, 2025, mission controllers have determined that it is unlikely that communication with the lander will be restored and therefore completing Success 9, is not achievable. It has been decided to conclude the mission.

Participants

Operators, payload owners, carriers and customers are recorded separately.

OrganizationRole
ispace, inc.Operator
ispace EUROPE S.A.Payload owner
National Aeronautics and Space AdministrationCustomer
SpaceXLaunch provider

Carried on this mission

Resources and evidence

ResourceEvidence
RegolithTargeted

Government authorizations

CountryHolder and missionInstrumentGrantedLinked mission
JapanJapan Space Resources Act permit to ispace for Mission 2 (RESILIENCE) (2024)Holder: ispace, inc.Space resources authorization2024-12-17GrantedSMBC x HAKUTO-R Venture Moon (ispace Mission 2, RESILIENCE lander)Flew. Outcome: failure

Dated events

  1. 2025-12-05

    ispace announces planned conclusion of the HAKUTO-R program

    On 2025-12-05, ispace announced that its HAKUTO-R program, begun in September 2018 and covering Missions 1 and 2, was expected to conclude on 2025-12-07 upon expiration of contracts with all 22 partner companies.

    Company announcement. No counterparty or government record found.

    Sources (1)
    1. ispace, inc.Company statementPublished 2025-12-05Accessed 2026-09-25Supports: date, summary
      the HAKUTO-R lunar exploration program launched in September 2018, will conclude upon the expiration of contracts with all 22 partner companies on Sunday, Dec. 7, 2025.
      Quote matched the source text when accessed.
  2. 2025-04-11

    Luxembourg's OST Article XI notification for ispace EUROPE's lunar activities

    Luxembourg informed the UN Secretary-General under OST Art. XI of ispace EUROPE S.A.'s Mission 2 activities (regolith collection for NASA and surface exploration within about 100 m of the landing site), noting the authorisation held under the 2017 space resources law.

    Sources (2)
    1. United Nations, COPUOSGovernment recordPublished 2025-04-24Accessed 2026-09-25Supports: datepage 1
      Note verbale dated 11 April 2025 from the Permanent Mission of Luxembourg to the United Nations (Vienna) addressed to the Secretary-General
      Quote matched the source text when accessed.
    2. United Nations, COPUOSGovernment recordPublished 2025-04-24Accessed 2026-09-25Supports: summarypage 2
      The mission includes the collection of lunar regolith to fulfil a resources purchase agreement with the National Aeronautics and Space Administration of the United States of America
      Quote matched the source text when accessed.
  3. 2025-03-19

    Japan's OST Article XI notification for ispace Mission 2

    Japan informed the UN Secretary-General under OST Art. XI of ispace Lander Mission 2 (Mare Frigoris, 60.5 N 4.6 W), listing a commercial transaction with NASA for lunar regolith acquisition as a special consideration.

    Sources (2)
    1. United Nations, COPUOSGovernment recordPublished 2025-03-21Accessed 2026-09-25Supports: datepage 1
      Note verbale dated 19 March 2025 from the Permanent Mission of Japan to the United Nations (Vienna) addressed to the Secretary- General
      Quote matched the source text when accessed.
    2. United Nations, COPUOSGovernment recordPublished 2025-03-21Accessed 2026-09-25Supports: summarypage 2
      Special consideration: commercial transaction with the National Aeronautics and Space Administration of the United States of America for lunar regolith acquisition
      Quote matched the source text when accessed.
  4. 2020-12-03

    NASA lunar regolith purchase contract to ispace Europe, $5,000

    NASA selected ispace Europe (Luxembourg) to collect lunar regolith and transfer ownership in place to NASA for $5,000. ispace states ispace EUROPE met interim milestones and received a payment in September 2022. The collection was planned with the TENACIOUS rover on Mission 2 under Luxembourg's authorisation; the lander was lost in a likely hard landing on 6 June 2025 and ispace concluded the mission, so no collection took place.

    Sources (5) and evidence gaps
    1. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: subject ids, date
      NASA has selected four companies to collect space resources and transfer ownership to the agency: Lunar Outpost of Golden, Colorado; Masten Space Systems of Mojave, California; ispace Europe of Luxembourg; and ispace Japan of Tokyo.
      Quote matched the source text when accessed.
    2. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: amount
      ispace Europe proposed collection for $5,000 following arrival in 2023 of a lander to the lunar South Pole.
      Quote matched the source text when accessed.
    3. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: summary
      Companies will receive 10% of their total proposed price upon award, will receive 10% upon launch, and the remaining 80% upon successful completion.
      Quote matched the source text when accessed.
    4. ispace, inc.Company statementPublished 2022-09-22Accessed 2026-09-25Supports: summary
      The payment is for achieving milestones in the second contract held by ispace EU.
      Quote matched the source text when accessed.
    5. ispace, inc.Company statementPublished 2025-06-06Accessed 2026-09-25Supports: summary
      It has been decided to conclude the mission.
      Quote matched the source text when accessed.
    • Amount of the 2022 milestone payment not stated; current contract status after Mission 2 not stated in any retrieved source.
  5. 2020-12-03

    NASA lunar regolith purchase contract to ispace (Japan), $5,000

    NASA selected ispace (Japan) to collect a small amount of lunar regolith and transfer ownership in place to NASA for $5,000 (10% on award, 10% on launch, 80% on completion). The collection attempt under this contract was covered by Japanese permits for Mission 1 (lander lost 26 April 2023) and Mission 2 (lander lost 6 June 2025); no transfer has occurred as far as primary sources show.

    Sources (7) and evidence gaps
    1. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: subject ids, date
      NASA has selected four companies to collect space resources and transfer ownership to the agency: Lunar Outpost of Golden, Colorado; Masten Space Systems of Mojave, California; ispace Europe of Luxembourg; and ispace Japan of Tokyo.
      Quote matched the source text when accessed.
    2. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: amount
      ispace Japan proposed collection for $5,000 following arrival in 2022 of a lander to Lacus Somniorum on the Moon's northeastern near side.
      Quote matched the source text when accessed.
    3. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: summary
      Companies will receive 10% of their total proposed price upon award, will receive 10% upon launch, and the remaining 80% upon successful completion.
      Quote matched the source text when accessed.
    4. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: summary
      Subsequent to receiving such imagery and data, an "in-place" transfer of ownership of the lunar regolith to NASA will take place.
      Quote matched the source text when accessed.
    5. ispace, inc.Company statementPublished 2024-12-17Accessed 2026-09-25Supports: summary
      The license allows ispace to complete a contract awarded by NASA in December 2020, to acquire regolith from the lunar surface and transfer ownership to the space agency.
      Quote matched the source text when accessed.
    6. ispace, inc.Company statementPublished 2023-05-26Accessed 2026-09-25Supports: summary
      Although the lander did not complete a soft landing
      Quote matched the source text when accessed.
    7. ispace, inc.Company statementPublished 2025-06-06Accessed 2026-09-25Supports: summary
      it is currently assumed that the lander likely performed a hard landing on the lunar surface
      Quote matched the source text when accessed.
    • Current status of the contract after the Mission 2 loss (open, modified, or terminated) is not stated in any retrieved NASA or ispace source.

Open evidence gaps

  • No record found of the formal close-out of the two NASA regolith contracts after the Mission 2 loss.

Record history

changes to this record's facts, newest first

ChangedFieldWasNowReasonSource
2024-12-17launch date2024 (planned)no earlier than January 2025Schedule slip[13]
2022-09-22launch date2023 (planned arrival, NASA award Dec 2020)2024 (planned, ispace Sept 2022)Schedule slip[12]

Sources

14 sources
  1. ispace, inc.Company statementPublished 2025-01-15Accessed 2026-09-25Supports: launch date, launch vehicle
    its RESILIENCE lunar lander has successfully deployed from a SpaceX Falcon 9 rocket following its launch at 1:11 a.m., Wednesday, Jan. 15, 2025 (U.S. Eastern Time).
    Quote matched the source text when accessed.
  2. ispace, inc.Company statementPublished 2024-09-12Accessed 2026-09-25Supports: target site
    its primary landing site for Mission 2 will be near the center of Mare Frigoris (Sea of Cold), 60.5 degrees north latitude and 4.6 degrees west longitude
    Quote matched the source text when accessed.
  3. ispace, inc.Company statementPublished 2025-06-06Accessed 2026-09-25Supports: phase, outcome
    As of 8:00 a.m. on June 6, 2025, mission controllers have determined that it is unlikely that communication with the lander will be restored and therefore completing Success 9, is not achievable. It has been decided to conclude the mission.
    Quote matched the source text when accessed.
  4. ispace, inc.Company statementPublished 2025-06-06Accessed 2026-09-25Supports: outcome
    The laser rangefinder used to measure the distance to the lunar surface experienced delays in obtaining valid measurement values. As a result, the lander was unable to decelerate sufficiently to reach the required speed for the planned lunar landing.
    Quote matched the source text when accessed.
  5. ispace, inc.Company statementPublished 2025-06-24Accessed 2026-09-25Supports: outcome
    Through subsequent and further analysis of telemetry data acquired from the lander confirmed that the technical cause of the hard landing was an anomaly in the LRF hardware.
    Quote matched the source text when accessed.
  6. NASA Goddard Space Flight CenterGovernment recordPublished 2025-06-20Accessed 2026-09-25Supports: phase, outcome
    captured photos of the site where the ispace Mission 2 SMBC x HAKUTO-R Venture Moon (RESILIENCE) lunar lander experienced a hard landing on June 5, 2025, UTC.
    Quote matched the source text when accessed.
  7. ispace, inc.Company statementPublished 2024-12-17Accessed 2026-09-25Supports: objective, resources
    the micro rover will use a scoop to pick up regolith from the lunar surface, photograph the regolith in the scoop and conduct an "in-place" transfer of ownership of the lunar regolith to NASA.
    Quote matched the source text when accessed.
  8. ispace, inc.Company statementPublished 2024-12-17Accessed 2026-09-25Supports: objective
    The license, granted under Japan's Act on the Promotion of Business Activities for the Exploration and Development of Space Resources (Space Resources Act), was provided by the Cabinet Office in advance of ispace's planned Mission 2
    Quote matched the source text when accessed.
  9. ispace, inc.Company statementPublished 2025-01-15Accessed 2026-09-25Supports: summary
    Water electrolyzer equipment : From Takasago Thermal Engineering Co.
    Quote matched the source text when accessed.
  10. ispace, inc.Company statementPublished 2025-05-09Accessed 2026-09-25Supports: summary
    On ispace's Mission 2, "SMBC x HAKUTO-R VENTURE MOON" Takasago developed the main payload, water electrolysis equipment, to attempt to split water into molecules on the Moon.
    Quote matched the source text when accessed.
  11. ispace, inc.Company statementPublished 2025-10-06Accessed 2026-09-25Supports: summary
    Kurita Water Industries provided ultra-pure water used in the water electrolysis device developed by Takasago Thermal Engineering Co., Ltd. that flew as a payload on ispace's Mission 2.
    Quote matched the source text when accessed.
  12. ispace, inc.Company statementPublished 2022-09-22Accessed 2026-09-25Supports: launch date
    currently planned for launch as early as November 2022 and 2024.
    Quote matched the source text when accessed.
  13. ispace, inc.Company statementPublished 2024-12-17Accessed 2026-09-25Supports: launch date
    in advance of ispace's planned Mission 2 set to launch on a SpaceX Falcon 9 rocket from Cape Canaveral, Fla., no earlier than January 2025.
    Quote matched the source text when accessed.
  14. ispace, inc.Company statementPublished 2026-03-27Accessed 2026-09-25Supports: outcome
    The External Review Task Force was commissioned following a technical cause analysis of the hard landing suffered by ispace's RESILIENCE lunar lander as part of HAKUTO-R Mission 2 on June 6, 2025.
    Quote matched the source text when accessed.