SpaceMiningData
SpacecraftNear-Earth asteroidIn development

DeepSpace-2

AstroForge's second deep-space spacecraft, a 200-kilogram vehicle with Hall-effect electric propulsion, intended to ride share on the Falcon 9 launch of Intuitive Machines' IM-3 and then rendezvous with and image a metallic near-Earth asteroid that has not yet been named. Flight hardware assembly was reported complete in June 2026 and integrated testing was under way; earlier descriptions of an AstroForge 'Vestri' mission, treated here as the same spacecraft by inference, said it would land on or dock with an asteroid, which current operator pages no longer state. AstroForge says it purchased a 200 kg rideshare mass budget from Intuitive Machines for a shared SpaceX launch; this is an arranged rideshare, not carriage by the IM-3 lander.

Objective. Rendezvous with a near-Earth metallic asteroid and capture high-resolution imagery of its shape, structure and clues to mineral composition (operator statement).

Targeted

Facts

Kind
Spacecraft
Mission type
Prospecting
Target
Near-Earth asteroidNot selected; operator describes a near-Earth M-type (metallic) asteroid, and press reports about 28 candidates
Launch
Planned 2027 Q1 (target)
Announcement date not recorded. Record checked 2026-10-28.
Launch vehicle
Falcon 9 (rideshare with Intuitive Machines IM-3, per press)
Phase
In developmentScoped schedule review on 2026-11-01: AstroForge's homepage explicitly targets the first quarter of 2027, while its dedicated DeepSpace-2 page retains fourth-quarter-2026 body text under a LAUNCHING 2027 banner. The date field records the homepage's stated target and does not resolve the conflicting operator text. No launch-provider manifest naming DeepSpace-2 is established, so the phase remains in development; older source and identity gaps remain open.
Outcome
Not applicable
Why it is included
Stated resource objective

How this launch date changed

Recorded change: the plan before → the plan after, oldest first.

  1. 2025-08-11: 2025 (as Vestri on IM-3) → early 2026Schedule slip [8]
  2. 2026-06-03: early 2026 → 2026-Q4Schedule slip [15]
  3. 2026-09-26: 2026-Q4 → 2027Schedule slip [12]
  4. 2026-11-01: 2027 → 2027-Q1 (operator homepage target; conflicting mission-page text retained)Source update [18]
Current launch date: Planned 2027 Q1 (target)
DeepSpace-2: launch dates on record2025-08-11: 2025 (as Vestri on IM-3) → early 2026. 2026-06-03: early 2026 → 2026-Q4. 2026-09-26: 2026-Q4 → 2027. 2026-11-01: 2027 → 2027-Q1 (operator homepage target; conflicting mission-page text retained).Jul 2025Jan 2026Jul 2026202520262027Date of the recorded changePlanned launch date2027-Q1 (operator homepage…
Each band is a plan as recorded between recorded changes; it may have changed in between without a record. The coloured band is the newest plan. A dashed edge means the plan began earlier than shown. A band can be wider than the words it stands for; the list gives them exactly.

Only changes recorded here are listed. The oldest date shown may not be the first plan ever announced, and a date with no recorded change may still have moved. A plan is not a launch.

All recorded schedule changes

What comes next

Next recorded dates are plans, not results.

Launch: Planned 2027 Q1 (target)Announcement date not recorded. Record checked 2026-10-28.

Participants

Operators, payload owners, carriers and customers are recorded separately.

OrganizationRole
AstroForgeOperator
SpaceXLaunch provider

Resources and evidence

ResourceEvidence
Metals (general)Targeted

Dated events

  1. 2025-08-11

    Safran to supply electric propulsion for AstroForge's Vestri mission

    Safran Defense & Space announced it was selected by AstroForge to deliver two EPS X00 electric propulsion systems for the Vestri asteroid mission, then scheduled for early 2026.

    Company statements only. No independent or government source is recorded here.

    Sources (1) and evidence gaps
    1. Safran Defense & Space, Inc. (via PR Newswire)Company statementPublished 2025-08-11Accessed 2026-09-25Supports: summary
      has been selected by AstroForge to manufacture and deliver two EPS
      Quote matched the source text when accessed.
    • Contract value not disclosed.
    • Safran has no entity record; counterparty named in summary only.

Open evidence gaps

  • Intuitive Machines or SpaceX manifest naming DeepSpace-2 (required before phase can be 'manifested').
  • Whether 'Vestri' and DeepSpace-2 are the same spacecraft, and the direction and date of any rename, are not established: AstroForge's 2025-03-06 debrief already calls its second spacecraft DeepSpace-2, while Safran's 2025-08-11 release names an AstroForge 'Vestri' asteroid mission scheduled for early 2026. This record treats them as one spacecraft by inference (matching mass, propulsion supplier, IM-3 ride and timeline).
  • Operator timing conflicts remain: the homepage captured 2026-11-01 targets first-quarter 2027, while the dedicated mission page still says fourth-quarter 2026 below a 2027 banner. Retained NASA host-flight and September 2026 press statements have differing precision/timing. No independently confirmed DeepSpace-2 launch date or manifest naming it is established.
  • Communications licence for DeepSpace-2.
  • Host flight not confirmed: AstroForge describes a ride with Intuitive Machines' IM-3, but no manifest record names it.
  • The available participant roles do not describe a rideshare arranger. Intuitive Machines is described in the narrative, without assigning it the unsupported carrier role; no independent manifest confirmation is implied.

Record history

changes to this record's facts, newest first

ChangedFieldWasNowReasonSource
2026-11-03participantsIntuitive Machines: carrierNo carrier role assigned to Intuitive Machines; operator-described purchased rideshare mass budget retained in narrativeCorrection[4]
2026-11-01launch date20272027-Q1 (operator homepage target; conflicting mission-page text retained)Source update[18]
2026-09-26launch date2026-Q42027Schedule slip[12]
2026-06-03launch dateearly 20262026-Q4Schedule slip[15]
2026-06-03objectiveLand on or dock with the target asteroid to characterize its compositionRendezvous with and image a near-Earth metallic asteroidSource update[1]
2025-08-11launch date2025 (as Vestri on IM-3)early 2026Schedule slip[8]

Sources

19 excerpts from 13 publications

One web address counts as one publication.

  1. AstroForgeCompany statementAccessed 2026-10-28Supports: objective, phase
    Launching in the fourth quarter of 2026, DeepSpace-2 will travel millions of kilometers to rendezvous with a near-Earth asteroid.
    Quote matched the source text when accessed.
  2. AstroForgeCompany statementAccessed 2026-10-28Supports: objective
    DeepSpace-2's payload is a high-resolution monochromatic camera.
    Quote matched the source text when accessed.
  3. AstroForgeCompany statementPublished 2026-06-03Accessed 2026-10-28Supports: phase, launch date
    Last month, we assembled the major flight hardware of DeepSpace-2 on our integration floor for the first time.
    Quote matched the source text when accessed.
  4. AstroForgeCompany statementPublished 2025-08-19Accessed 2026-11-03Supports: participants, summary, open evidence gaps
    Instead, Intuitive Machines (IM) has purchased a rocket launch from SpaceX to travel to the moon, and we’re essentially hitching a ride by purchasing a ticket from IM. We have purchased a 200kg mass budget from IM.
    Quote matched the source text when accessed.
  5. AstroForgeCompany statementPublished 2025-03-06Accessed 2026-10-28Supports: carrier mission, open evidence gaps
    DeepSpace-2 will be our second spacecraft and is scheduled to launch on the IM3 mission.
    Quote matched the source text when accessed.
  6. AstroForgeCompany statementPublished 2025-03-06Accessed 2026-10-28Supports: record history
    Landing legs for its primary mission: landing on a metallic asteroid to measure platinum group metals on the surface
    Quote matched the source text when accessed.
  7. PayloadPressPublished 2026-06-05Accessed 2026-10-28Supports: launch vehicle, participants
    The spacecraft is scheduled to fly onboard a SpaceX Falcon 9 rocket, which is also carrying Intuitive Machines' IM-3 lander to the lunar surface.
    Quote matched the source text when accessed.
  8. Safran Defense & Space, Inc. (via PR Newswire)Company statementPublished 2025-08-11Accessed 2026-10-28Supports: record history, summary, open evidence gaps
    for the company's upcoming Vestri asteroid mission, scheduled to launch in early 2026
    Quote matched the source text when accessed.
  9. PayloadPressPublished 2024-08-21Accessed 2026-10-28Supports: record history, summary
    A 200-kg spacecraft called Vestri, which will land on the target asteroid to completely characterize its composition; it will fly on IM-3, expected to launch in 2025.
    Quote matched the source text when accessed.
  10. Aerospace America (AIAA)PressPublished 2026-06-15Accessed 2026-10-28Supports: target site
    AstroForge will choose among them closer to launch.
    Quote matched the source text when accessed.
  11. Aerospace America (AIAA)PressPublished 2026-06-15Accessed 2026-10-28Supports: summary
    AstroForge is self-funding DeepSpace-2, which Gialich said will cost around $10 million.
    Quote matched the source text when accessed.
  12. AstroForgeCompany statementAccessed 2026-10-28Supports: launch date
    LAUNCHING 2027 DEEPSPACE-2 The first commercially viable path to deep space.
    Quote matched the source text when accessed.
  13. AstroForgeCompany statementPublished 2026-09-21Accessed 2026-10-28Supports: phase
    Our next mission, DeepSpace-2, will fly Solo in shadow mode.
    Quote matched the source text when accessed.
  14. Aerospace America (AIAA)PressPublished 2026-09-15Accessed 2026-10-28Supports: launch date
    The next two — Blue Origin’s Mark 1 Endurance and Intuitive Machines’ Nova-C Trinity — are now slated to launch in “the first part of 2027,”
    Quote matched the source text when accessed.
  15. AstroForgeCompany statementPublished 2026-06-03Accessed 2026-10-28Supports: record history
    ready for testing and further refinement as we prepare for launch in the fourth quarter of this year.
    Quote matched the source text when accessed.
  16. NASAGovernment recordAccessed 2026-10-28Supports: open evidence gaps
    Early 2027
    Quote matched the source text when accessed.
  17. TechCrunchPressPublished 2026-09-22Accessed 2026-10-28Supports: launch vehicle, open evidence gaps
    The company’s third vehicle, DeepSpace-2, is currently set to launch alongside Intuitive Machines’ third moon mission
    Quote matched the source text when accessed.
  18. AstroForgeCompany statementAccessed 2026-11-01Supports: launch date, status explanation, record history
    Launching in the first quarter of 2027, DeepSpace-2 will travel millions of kilometers to rendezvous with a near-Earth asteroid.
    Quote matched the source text when accessed.
  19. AstroForgeCompany statementAccessed 2026-11-01Supports: open evidence gaps, status explanation
    Launching in the fourth quarter of 2026, DeepSpace-2 will travel millions of kilometers to rendezvous with a near-Earth asteroid.
    Quote matched the source text when accessed.

Cite this record

SpaceMiningData, “DeepSpace-2”, dataset version a00fa2c68a45, built 2026-11-11, https://spaceminingdata.com/missions/astroforge-deepspace-2.html. Record checked 2026-10-28.