AeroFly LLC
U.S. company listed in Brookings, South Dakota in federal award records, developing lunar-regolith conveyance and auger-based water-vapor extraction through NASA SBIR work. Two Phase II contracts establish funded technology development; the sources reviewed do not establish a lunar flight or completed extraction result.
An organization's level is recorded separately and is not a ranking of its linked missions' results. How the ladder works.
Resources and evidence
Each resource shows the highest step primary sources support. How the ladder works.
| Resource | Evidence | Meaning |
|---|---|---|
| Regolith | Targeted | work aimed at it |
| Water ice | Targeted | work aimed at it |
Demonstrated
The reviewed award records establish contracts and proposed technology scope; no completed extraction test, flight or resource delivery is established by these sources.
Claimed or planned
Federal contract descriptions identify Phase II work on vertical lunar-regolith conveyance (80NSSC25C0087) and continuous auger-based water-vapor extraction from icy lunar regolith (80NSSC26C0090). The described use case is lunar resource handling and extraction, not a demonstrated lunar operation.
Facts
- Headquarters
- United States
- Type
- Company
- Status
- Activeas of 2026-09-28. A recipient-specific federal record lists NASA Phase II contract 80NSSC26C0090 signed 2026-09-28, with a reported period of performance from 2026-09-30 to 2028-09-29. This supports recent funded development activity, not a corporate-register or flight-readiness check.
- Roles
- Extraction, Processing / ISRU
- Targets
- Moon
- Also known as
- AEROFLY LLC
Dated events
Amounts are shown one at a time as each source states them. They are never added together.
- 2026-09-28
AeroFly NASA Phase II contract for auger-based lunar water-vapor extraction
The federal record identifies NASA SBIR Phase II contract 80NSSC26C0090, signed 2026-09-28, for sbir phase ii continuous auger-based water vapor extraction from icy lunar regolith. As captured on 2026-10-31, the record reports USD 1,274,996 in total obligations; this is not a payment total or an amount established as newly obligated on the signing date.
Sources (5) and evidence gaps
SBIR PHASE II CONTINUOUS AUGER-BASED WATER VAPOR EXTRACTION FROM ICY LUNAR REGOLITH
AEROFLY LLC
"total_obligation":1274996.0
"date_signed":"2026-09-28"
"start_date":"2026-09-30","end_date":"2028-09-29"
- The structured amount is left unset because the captured value is cumulative total_obligation, not the amount newly awarded or paid on the original signing date. The attributed snapshot value is preserved in the summary.
- Contract performance and completed technical outcomes are not established by the award record.
- 2025-08-01
AeroFly NASA Phase II contract for vertical lunar-regolith conveyance
The federal record identifies NASA SBIR Phase II contract 80NSSC25C0087, signed 2025-08-01, for phase ii sbir vertical lunar regolith conveyance for in-situ resource utilization. As captured on 2026-10-31, the record reports USD 898,925 in total obligations; this is not a payment total or an amount established as newly obligated on the signing date.
Sources (5) and evidence gaps
PHASE II SBIR VERTICAL LUNAR REGOLITH CONVEYANCE FOR IN-SITU RESOURCE UTILIZATION
AEROFLY LLC
"total_obligation":898925.0
"date_signed":"2025-08-01"
"start_date":"2025-08-05","end_date":"2027-08-05"
- The structured amount is left unset because the captured value is cumulative total_obligation, not the amount newly awarded or paid on the original signing date. The attributed snapshot value is preserved in the summary.
- Contract performance and completed technical outcomes are not established by the award record.
Open evidence gaps
- Founding year, independently verified company website and corporate-register status were not established in this batch.
- The specific relationship to the South Dakota State University Break the Ice challenge team was not established; no partnership or university-team link is asserted here.
- Hardware maturity, test outcomes, flight manifest and completed extraction results are not established by the reviewed award records.
Sources
10 excerpts from 2 publicationsOne web address counts as one publication.
PHASE II SBIR VERTICAL LUNAR REGOLITH CONVEYANCE FOR IN-SITU RESOURCE UTILIZATION
AEROFLY LLC
"date_signed":"2025-08-01"
"start_date":"2025-08-05","end_date":"2027-08-05"
"country_name":"UNITED STATES"
SBIR PHASE II CONTINUOUS AUGER-BASED WATER VAPOR EXTRACTION FROM ICY LUNAR REGOLITH
AEROFLY LLC
"date_signed":"2026-09-28"
"start_date":"2026-09-30","end_date":"2028-09-29"
"country_name":"UNITED STATES"
Cite this record
SpaceMiningData, “AeroFly LLC”, dataset version a00fa2c68a45, built 2026-11-11, https://spaceminingdata.com/organizations/aerofly.html. Record checked 2026-10-31.