SpaceMiningData
SpacecraftMoonCancelled

Masten Mission One (XL-1 lander, NASA CLPS task order TO19C)

Planned Masten XL-1 lander flight to the lunar south pole carrying NASA instruments, several aimed at lunar volatiles and resources (MSolo, NIRVSS, the Neutron Spectrometer System on MoonRanger, L-CIRiS); it never launched. NASA's Inspector General reports the task order was terminated after Masten's 2022 bankruptcy, with USD 66.1 million already paid.

Objective. Deliver and operate NASA instruments to characterize south-polar surface composition and volatiles, including hydrogen as an indicator of buried water, and (separately contracted) collect a regolith sample for sale to NASA.

Targeted

See the south pole on the 3D Moon

Facts

Kind
Spacecraft
Mission type
Prospecting
Target
Moonlunar south poleSouth polar region, no point: Lunar south pole missions
Launch
Former plan: 2023-11
Historical. The mission was cancelled.
Launch vehicle
SpaceX (vehicle not specified in retrieved sources)
Phase
CancelledTerminal-state recheck on 2026-11-04: NASA OIG report IG-24-013 remains published and records the terminated task order, with USD 66.1 million paid against Masten's USD 81.3 million task order. Its Table 2 (as of February 2024) labels November 2023 as the Actual/Last Estimated Launch Date. This is a retained historical estimate for the cancelled mission, not a pending or actual launch. The official PDF was read manually through a document-text provider after the bounded capture exceeded its size cap; sources disclose that method.
Outcome
Not applicable
Why it is included
Carries a resource instrument

Outcome statement (agency statement)

As a result of this bankruptcy, NASA lost the $66 million in milestone payments made to Masten and is in the process of settling recoveries.

How this launch date changed

Recorded change: the plan before → the plan after, oldest first.

  1. 2021: 2022-11 (task-order launch date, NASA OIG) → 2023-11Schedule slip [8]
Former plan: 2023-11
Date details

Historical. The mission was cancelled.

Only changes recorded here are listed. The oldest date shown may not be the first plan ever announced, and a date with no recorded change may still have moved. A plan is not a launch.

All recorded schedule changes

What comes next

This mission was cancelled. Any former plan stays in the facts above as history.

Participants

Operators, payload owners, carriers and customers are recorded separately.

Resources and evidence

ResourceEvidence
Water iceTargeted
VolatilesTargeted
RegolithTargeted

Dated events

  1. 2020-12-03

    NASA lunar regolith purchase contract to Masten Space Systems, $15,000

    NASA selected Masten Space Systems to collect lunar regolith and transfer ownership in place to NASA for $15,000, following a planned 2023 South Pole landing. Masten never flew a lunar lander; Masten filed for Chapter 11 in July 2022; Astrobotic announced in September 2022 that it had acquired Masten, and a Chapter 11 plan of liquidation for Masten Space Systems, Inc. was later confirmed and reported effective. The fate of this contract is not documented in retrieved sources.

    Sources (5) and evidence gaps
    1. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: organizations or records involved, date
      NASA has selected four companies to collect space resources and transfer ownership to the agency: Lunar Outpost of Golden, Colorado; Masten Space Systems of Mojave, California; ispace Europe of Luxembourg; and ispace Japan of Tokyo.
      Quote matched the source text when accessed.
    2. NASAGovernment recordPublished 2020-12-03Accessed 2026-09-25Supports: amount
      Masten Space Systems proposed collection for $15,000 following arrival in 2023 of a lander to the lunar South Pole.
      Quote matched the source text when accessed.
    3. Astrobotic TechnologyCompany statementPublished 2022-09-13Accessed 2026-09-25Supports: summary
      Astrobotic announces today the acquisition of Masten Space Systems
      Quote matched the source text when accessed.
    4. CourtListener (RECAP of PACER)Court or regulatory filingAccessed 2026-09-25Supports: summary
      Chapter 11 Voluntary Petition . Fee Amount $1738. Filed by Masten Space Systems, Inc.
      Quote matched the source text when accessed.
    5. CourtListener (RECAP of PACER)Court or regulatory filingAccessed 2026-09-25Supports: summary
      Notice of Entry of Order Confirming, and Occurrence of Effective Date of Modified Combined Disclosure Statement and Chapter 11 Plan of Liquidation of Masten Space Systems, Inc.
      Quote matched the source text when accessed.
    • Termination, assignment, or other disposition of Masten's regolith contract after the 2022 acquisition not found in any primary source.
    • Underlying confirmation-order and effective-date-notice PDFs were not retrieved; the precise effective date and completion of liquidation are not established by the retained docket entries.
  2. 2020-04-08

    NASA CLPS task order to Masten Space Systems for south-pole delivery (USD 75.9 million)

    NASA awarded Masten a USD 75.9 million CLPS task order to deliver eight payloads (nine instruments), several resource-related, to the lunar south pole; NASA OIG later reported the value grew to USD 81.3 million and the task order was terminated.

    Sources (3)
    1. NASAGovernment recordPublished 2020-04-08Accessed 2026-09-25Supports: amount, date
      The $75.9 million award includes end-to-end services for delivery of the instruments
      Quote matched the source text when accessed.
    2. NASA Office of Inspector GeneralGovernment recordPublished 2024-06-06Accessed 2026-09-25Supports: summary
      Further, two task orders were terminated, one of which had already been paid $66.1 million of the $81.3 million task order value based on milestones performed.
      Quote matched the source text when accessed.
    3. NASA Office of Inspector GeneralGovernment recordPublished 2024-06-06Accessed 2026-09-25Supports: summary
      As a result of this bankruptcy, NASA lost the $66 million in milestone payments made to Masten and is in the process of settling recoveries.
      Quote matched the source text when accessed.

Open evidence gaps

  • Exact date of NASA's termination of task order TO19C not found.
  • Masten's own mission page (masten.aero) unreachable; specific landing site (reported elsewhere as near Haworth crater) not confirmed from a retrieved primary source.
  • Status of the separate USD 15,000 NASA regolith-purchase contract after the bankruptcy not found.

Record history

changes to this record's facts, newest first

ChangedFieldWasNowReasonSource
2022phaseIn developmentCancelledSource update[4]
2021launch date2022-11 (task-order launch date, NASA OIG)2023-11Schedule slip[8]

Sources

8 excerpts from 3 publications

One web address counts as one publication.

  1. NASAGovernment recordPublished 2020-04-08Accessed 2026-10-28Supports: participants, target site
    NASA has selected Masten Space Systems of Mojave, California, to deliver and operate eight payloads - with nine science and technology instruments - to the Moon's South Pole in 2022
    Quote matched the source text when accessed.
  2. NASAGovernment recordPublished 2020-04-08Accessed 2026-10-28Supports: why it is included, resources
    Mass Spectrometer Observing Lunar Operations ( MSolo ) is a device to measure potentially accessible resources on the Moon's surface.
    Quote matched the source text when accessed.
  3. NASAGovernment recordPublished 2020-04-08Accessed 2026-10-28Supports: resources, objective
    The MoonRanger will carry the Neutron Spectrometer System, which will measure the concentration of hydrogen in the Moon’s regolith – a possible indication of the existence of buried water.
    Quote matched the source text when accessed.
  4. NASA Office of Inspector GeneralGovernment recordPublished 2024-06-06Accessed 2026-11-04Supports: phase, status explanation
    Further, two task orders were terminated, one of which had already been paid $66.1 million of the $81.3 million task order value based on milestones performed.
    Quote compared with the source by an AI model on 2026-11-04. This comparison may use parsed or cached text; it does not establish a fresh download or current status.
  5. NASA Office of Inspector GeneralGovernment recordPublished 2024-06-06Accessed 2026-11-04Supports: outcome
    As a result of this bankruptcy, NASA lost the $66 million in milestone payments made to Masten and is in the process of settling recoveries.
    Quote compared with the source by an AI model on 2026-11-04. This comparison may use parsed or cached text; it does not establish a fresh download or current status.
  6. Spaceflight NowPressPublished 2022-07-29Accessed 2026-10-28Supports: launch date, record history
    Masten last year announced the launch of its first lunar mission - called Masten Mission One - would be delayed nearly a year to November 2023.
    Quote matched the source text when accessed.
  7. Spaceflight NowPressPublished 2022-07-29Accessed 2026-10-28Supports: launch vehicle, participants
    Masten selected SpaceX to launch its XL-1 lunar lander mission, and owes the launch provider $4.6 million.
    Quote matched the source text when accessed.
  8. NASA Office of Inspector GeneralGovernment recordPublished 2024-06-06Accessed 2026-11-04Supports: record history, launch date
    Masten Space Systems (TO19C)c April 2020 75.9 81.3 7 November 2022 November 2023
    Quote compared with the source by an AI model on 2026-11-04. This comparison may use parsed or cached text; it does not establish a fresh download or current status.

Cite this record

SpaceMiningData, “Masten Mission One (XL-1 lander, NASA CLPS task order TO19C)”, dataset version a00fa2c68a45, built 2026-11-11, https://spaceminingdata.com/missions/masten-mission-one.html. Record checked 2026-11-04.