Turn Apophis in 3D: a preliminary radar shape of a mission target

Karman+'s first spacecraft mission, a technology demonstration that the company's February 2025 funding release calls High Frontier and its 2026 pages call Mission 1. Karman+'s High Frontier page gives the primary objective as rendezvousing with an uncharacterized near-Earth asteroid and showcasing capturing regolith at kilogram scale, with zero-g excavation among its listed focus areas. On 21 July 2026 the company said the original early-2027 launch slipped because its propulsion vendor could not deliver on time, that it found a mid-2028 launch slot, and that its first mission is going to asteroid (99942) Apophis, whose close approach to Earth on 13 April 2029 falls near the spacecraft's Earth escape. Its missions page names the spacecraft Corvus (about 700 kg and about 10 kW of power), shows rendezvous in 2030 and a 'Building & Testing' status, and describes the plan as rendezvousing with Apophis and deploying tests to the surface. The company says this first mission is a technology demonstration, not a mining mission for customers. No launch provider has been named.

Objective. Rendezvous with a near-Earth asteroid and demonstrate capture of regolith at kilogram scale through zero-g excavation, as stated on the company's High Frontier page; after retargeting to Apophis, the company describes the plan as rendezvousing with the asteroid and deploying its tests to the surface, which it says will let it test its mining technology. The company calls the mission a technology demonstration, not a mining mission with customers waiting for water.

Targeted

See Apophis in 3D

Facts

Kind
Spacecraft
Mission type
Technology demonstration
Target
Near-Earth asteroidAsteroid (99942) Apophis (operator's target since July 2026; the earlier High Frontier description named an uncharacterized near-Earth asteroid)What NASA/JPL lists for 99942 Apophis (2004 MN4)
Launch
Planned 2028 (target)
Announcement date not recorded. Record checked 2026-10-30.
Phase
In developmentKarman+ missions page (undated, copyright 2026, accessed 2026-10-30) labels the Corvus spacecraft 'Building & Testing' with launch in mid-2028 and rendezvous in 2030. The company post of 21 July 2026 reports that the early-2027 launch slipped after a propulsion-vendor delay and that a mid-2028 slot was found. The February 2025 funding release says the funds will be used to develop the first technology demonstration mission. No launch provider, vehicle or manifest is named, so the phase is in_development, not manifested. Not launched.
Outcome
Not applicable
Why it is included
Stated resource objective

How this launch date changed

Recorded change: the plan before → the plan after, oldest first.

  1. 2026-07-21: early 2027 → mid 2028Schedule slip [7]
Current launch date: Planned 2028 (target)

Only changes recorded here are listed. The oldest date shown may not be the first plan ever announced, and a date with no recorded change may still have moved. A plan is not a launch.

All recorded schedule changes

What comes next

Next recorded dates are plans, not results.

Launch: Planned 2028 (target)Announcement date not recorded. Record checked 2026-10-30.

Participants

Operators, payload owners, carriers and customers are recorded separately.

OrganizationRole
Karman+Operator

Resources and evidence

ResourceEvidence
RegolithTargeted

Dated events

  1. 2026-07-21

    Karman+ first mission slips to mid-2028 and retargets to Apophis

    Karman+ said its first mission's early-2027 launch slipped because its propulsion vendor could not deliver on time, that the new launch slot is mid-2028, and that asteroid 99942 Apophis became its target. In October 2025 the company had said it would launch on SpaceX Transporter-19 in about 15 months.

    Company statements only. No independent or government source is recorded here.

    Sources (4) and evidence gaps
    1. Karman+Company statementPublished 2026-07-21Accessed 2026-09-25Supports: summary
      our original launch in early 2027 slipped because our propulsion vendor could not deliver on time
      Quote matched the source text when accessed.
    2. Karman+Company statementPublished 2026-07-21Accessed 2026-09-25Supports: summary
      We had to scramble to find a new slot, which ended up being a mid 2028 launch.
      Quote matched the source text when accessed.
    3. Karman+Company statementPublished 2025-10-27Accessed 2026-09-25Supports: summary
      We're launching in ~15 months on Transporter 19.
      Quote matched the source text when accessed.
    4. Karman+Company statementPublished 2025-10-27Accessed 2026-09-25Supports: summary
      To rendezvous with an uncharacterized near-Earth Asteroid and showcase capturing regolith at kilogram scale, minimizing mission duration and cost.
      Quote matched the source text when accessed.
    • Launch provider and vehicle for the mid-2028 slot.

Open evidence gaps

  • No launch provider, launch vehicle or manifest is named for the mid-2028 launch slot; the propulsion vendor is not named.
  • The identification of High Frontier with Mission 1 (Corvus, Apophis) is inferred: both are described as Karman+'s first demonstration mission, and the High Frontier page's February 2027 launch matches the 'original launch in early 2027' of the July 2026 post. The 2026 mission pages do not use the name High Frontier in their text, although the High Frontier page shows an image labelled 'K+ Mission 1 -> 99942 Apophis' (seen through the web tool, not quote-checkable).
  • The High Frontier page is undated and still says launch in February 2027, contradicting the company's July 2026 post (mid-2028).
  • The kilogram-scale regolith-capture objective comes from the undated High Frontier page written for the earlier target (an uncharacterized near-Earth asteroid). The 2026 Apophis pages speak only of deploying tests to the surface and do not restate a regolith quantity or say whether regolith will be captured at Apophis.
  • The company describes Apophis as an S-type 'dry ball of dirt' and says the mission is not for water, so water is not recorded as a target of this mission.
  • The 'Building & Testing' hardware status and the 2030 rendezvous date are company labels; no independent evidence of hardware tests was found. The rendezvous date is not recorded as a landing date because no landing of the spacecraft is stated.

Record history

changes to this record's facts, newest first

ChangedFieldWasNowReasonSource
2026-07-21launch dateearly 2027mid 2028Schedule slip[7]

Sources

16 excerpts from 4 publications

One web address counts as one publication.

  1. Karman+Company statementAccessed 2026-10-30Supports: objective, resources, why it is included, name
    To rendezvous with an uncharacterized near-Earth Asteroid and showcase capturing regolith at kilogram scale
    Quote matched the source text when accessed.
  2. Karman+Company statementAccessed 2026-10-30Supports: objective, summary
    Zero-g excavation
    Quote matched the source text when accessed.
  3. Karman+Company statementAccessed 2026-10-30Supports: open evidence gaps
    Our first mission to a near Earth asteroid launches in February 2027.
    Quote matched the source text when accessed.
  4. Karman+Company statementPublished 2025-02-19Accessed 2026-10-30Supports: name, summary, mission type
    High Frontier, Karman+'s first technical demonstration mission, is set to prove the approach the company is taking
    Quote matched the source text when accessed.
  5. Karman+Company statementPublished 2025-02-19Accessed 2026-10-30Supports: phase, status explanation
    will be used to develop its first technology demonstration mission and customer missions, expected in 2027.
    Quote matched the source text when accessed.
  6. Karman+Company statementPublished 2026-07-21Accessed 2026-10-30Supports: phase, status explanation, summary, record history
    our original launch in early 2027 slipped because our propulsion vendor could not deliver on time.
    Quote matched the source text when accessed.
  7. Karman+Company statementPublished 2026-07-21Accessed 2026-10-30Supports: launch date, status explanation, record history
    We had to scramble to find a new slot, which ended up being a mid 2028 launch.
    Quote matched the source text when accessed.
  8. Karman+Company statementPublished 2026-07-21Accessed 2026-10-30Supports: target site, target body
    Our first mission is going to asteroid Apophis.
    Quote matched the source text when accessed.
  9. Karman+Company statementPublished 2026-07-21Accessed 2026-10-30Supports: target site
    It received the permanent number 99942 on 24 June 2005
    Quote matched the source text when accessed.
  10. Karman+Company statementPublished 2026-07-21Accessed 2026-10-30Supports: mission type, objective, summary
    But this first mission is a technology demonstration, not a mining mission with customers waiting for water.
    Quote matched the source text when accessed.
  11. Karman+Company statementPublished 2026-07-21Accessed 2026-10-30Supports: objective
    it will allow us to test our mining tech.
    Quote matched the source text when accessed.
  12. Karman+Company statementAccessed 2026-10-30Supports: launch date, target site, summary
    When our launch moved to mid-2028 we re-ran our leaderboard and Apophis came out on top, because its close approach lands almost exactly when we reach Earth escape.
    Quote matched the source text when accessed.
  13. Karman+Company statementAccessed 2026-10-30Supports: name, summary
    Corvus weighs 700kg and has ~10kW of power.
    Quote matched the source text when accessed.
  14. Karman+Company statementAccessed 2026-10-30Supports: objective
    Rendezvous with Apophis, then deploy our tests to the surface.
    Quote matched the source text when accessed.
  15. Karman+Company statementAccessed 2026-10-30Supports: phase, status explanation
    Building & Testing
    Quote matched the source text when accessed.
  16. Karman+Company statementAccessed 2026-10-30Supports: resources, open evidence gaps
    It is an S-type: a dry ball of dirt.
    Quote matched the source text when accessed.

Cite this record

SpaceMiningData, “Karman+ Mission 1 (High Frontier, Corvus spacecraft)”, dataset version a00fa2c68a45, built 2026-11-11, https://spaceminingdata.com/missions/karman-plus-mission-1.html. Record checked 2026-10-30.