SpaceMiningData
Research institutionItalyUnknown

Politecnico di Milano

Italian technical university covered here only for its named role as a subcontractor, with OHB System AG and BlueHorizon, in the OHB Italia-led team contracted by ESA in 2018 to define the technology-demonstrator payload for ESA's Lunar ISRU Demonstration Mission, which was then expected to fly in 2025. An undated OHB Italia page also credits OHB Italia and the university with ground experiments in that programme in which a system fed with sand simulating polar lunar soil produced the expected amount of water. The sources reviewed establish a payload-definition study and Earth-based simulant tests only: no flight hardware, no extraction on the Moon, and no current status of the mission.

No level assigned

An organization's level is recorded separately and is not a ranking of its linked missions' results. How the ladder works.

Facts

Headquarters
Italy
Type
Research institution
Status
UnknownStatus date not recorded. The documented resource roles are a March 2018 payload-definition study and an undated company-attributed simulant experiment. OHB's news-page date is 1 March and its PDF dateline is 5 March 2018. This scoped review does not establish a separately dated current institutional or contract status; unknown does not mean inactive.
Roles
Processing / ISRU
Targets
Moon

Open evidence gaps

  • Publication date conflict kept: OHB Italia's news page lists the release as 1 March 2018 and its PDF carries the dateline 'Bremen / Milano, 5th March 2018'.
  • The 2018 release is a payload-definition study contract; no source reviewed records flight hardware. The 2025 flight expectation is a 2018 statement, not a current plan; the mission's current status is on ESA lunar ISRU demonstration mission (oxygen-from-regolith payload; not flown) and was not re-checked here.
  • The undated OHB Italia instruments page does not say when the simulant experiments were run, who carried out which part, or what apparatus was used; 'produced the expected amount of water' is a company statement of a ground test, not extraction on the Moon.
  • No university-authored page about the 2018 study was retrieved; its official home page supports name and country. Existing ORACLE evidence explicitly identifies Politecnico di Milano as the Phase A/B1 partner in October 2024. Its role after the 2025 industrial contract is not stated. This profile's summary remains limited to the 2018 study and simulant experiments.
  • A snippet-only abstract from a 2018 conference record was not captured and is not used.
  • Founding year left null although the university home page says 'Since 1863': the page does not say that was the founding year.

Sources

9 excerpts from 5 publications

One web address counts as one publication.

  1. OHB ItaliaCompany statementPublished 2018-03-01Accessed 2026-10-31Supports: summary, role
    A team led by OHB Italia SpA as prime and with subcontractors OHB System AG, Germany, Politecnico di Milano and the OHB spin-off BlueHorizon, Luxembourg, is in charge of the definition of the technology demonstrator payload.
    Quote matched the source text when accessed.
  2. OHB ItaliaCompany statementPublished 2018-03-01Accessed 2026-10-31Supports: summary, role
    OHB Italia has been awarded a contract by the European Space Agency (ESA) for the definition of the payload for the Lunar ISRU Demonstration Mission (ISRU DM), expected to be flown in 2025.
    Quote matched the source text when accessed.
  3. OHB ItaliaCompany statementPublished 2018-03-01Accessed 2026-10-31Supports: status explanation, open evidence gaps
    1 March 2018
    Quote matched the source text when accessed.
  4. OHB ItaliaCompany statementPublished 2018-03-05Accessed 2026-10-31Supports: status explanation, open evidence gaps
    Bremen / Milano, 5th March 2018.
    Quote matched the source text when accessed.
  5. OHB ItaliaCompany statementAccessed 2026-10-31Supports: summary, role
    The experiments were conducted by OHB Italia S.p.A. as Prime Contractor and the Politecnico di Milano in the frame of the In-Situ Resource Utilisation (ISRU) Demonstration Mission
    Quote matched the source text when accessed.
  6. OHB ItaliaCompany statementAccessed 2026-10-31Supports: summary, role
    The system powered with sand simulating polar lunar soil, produced the expected amount of water
    Quote matched the source text when accessed.
  7. Politecnico di MilanoCompany statementAccessed 2026-10-31Supports: headquarters country, name
    Since 1863, Italy's largest science-technology university
    Quote matched the source text when accessed.
  8. Politecnico di MilanoCompany statementAccessed 2026-10-31Supports: headquarters country, name
    Politecnico di Milano, Piazza Leonardo da Vinci 32, 20133 Milano
    Quote matched the source text when accessed.
  9. ASI and Politecnico di Milano authors (IAC-24 paper, Politecnico di Milano repository)Government recordPublished 2024-10Accessed 2026-10-31Supports: open evidence gaps
    The partner for the in-progress Phase A/B1 is the Politecnico di Milano
    Quote matched the source text when accessed.

Cite this record

SpaceMiningData, “Politecnico di Milano”, dataset version a00fa2c68a45, built 2026-11-11, https://spaceminingdata.com/organizations/politecnico-di-milano.html. Record checked 2026-10-31.